100898 2007-11-08 | Point Source(s): Main Crude Charge Pump Pollutant(s):Crude Oil - 3 gallons | Cause of Problem: Other- Fire xxxxxxxx | There was a fire at the Main Crude Charge Pump, no cause for the fire was given. |
No LDEQ Number Available 2007-10-15 | Point Source(s): Shut down of FCCU Unit Pollutant(s):No Information Given - BRQ | Cause of Problem: Start Up, Shut Down xxxxxxxx | Need to find LDEQ #. Report said that the unit was back online 10/18/05-which is probably a typo. |
No LDEQ Number Available 2007-10-14 | Point Source(s): Fin Fan Leak in Poly Unit Pollutant(s):Butane - 979 pounds | Cause of Problem: Equipment Failure xxxxxxxx | Need to find LDEQ #. A small leak was discovered in the Fin Fan in the Poly Unit so the unit was shut down immediately. It re-opened 10/18/2007. All the tubes were re-rolled and then hydrotested for additional leaks and none were found. |
99248 2007-09-07 | Point Source(s): Fin Fan Leak in Poly Unit Pollutant(s):Butane - 730 pounds | Cause of Problem: Equipment Failure xxxxxxxx | A small leak was discovered in the a tube of a Fin Fan in the Poly Unit so the unit was shut down immediately. It re-opened 09/08/2007. The tubes were hydrotested for additional leaks and none were found. |
99045 2007-08-16 | Point Source(s): Leak in tube of Poly Debutanizer Overhead Fin Fans in Poly Unit Pollutant(s):Butane - 337 pounds | Cause of Problem: Equipment Failure xxxxxxxx | A pin-hole sized leak was discovered in the a tube of a Poly Debutanizer Overhead Fin Fan in the Poly Unit so the unit was shut down immediately It re-opened 08/11/2007. It was shut down again on 8/14/2007 to replace the bundle of tubes. |
98022 2007-07-20 | Point Source(s): Fin Fan Leak in Poly Unit Pollutant(s):Butane - 211 pounds | Cause of Problem: Equipment Failure xxxxxxxx | A pin-hole sized leak was discovered in the Fin Fan in the Poly Unit so the unit was shut down shortly after. It re-opened 07/21/2007. |
97619 2007-07-05 | Point Source(s): Fin Fan Leak in Poly Unit Pollutant(s):Butane - 192 pounds | Cause of Problem: Equipment Failure xxxxxxxx | A pin-hole sized leak was discovered in the Fin Fan in the Poly Unit so the unit was shut down. It re-opened 07-07/2007. |
96724 2007-06-04 | Point Source(s): equipment malfunction in FCCU (Complex II) Pollutant(s):No Information Given - BRQ | Cause of Problem: Start Up, Shut Down Start Up, Shut Down - Due to equipment malfunction | The unplanned shutdown was caused by an equipment malfunction and daily updates were made until unit was secured. |
96558 2007-05-27 | Point Source(s): Hatch on Barge CTCO 351-B (D1149816) Pollutant(s):Diesel Fuel - 210 gallons | Cause of Problem: Human Factors Operator over-filled barge and it spilled into river | Actual Incident Report still needs to be found. There were two NRC reports. The first said 2 bbl were released. The second said 50 were released and 40 bbl were in the water. The police report said 50 bbl were released, then changed that to 5 bbl and then to an estimated 8-12 bbl. Absorbent boom was placed to contain the spill. |
94106 2007-02-21 | Point Source(s): Resid pump in Crude Unit (Complex I) Pollutant(s):Resid - BRQ | Cause of Problem: No information given xxxxxxxx | Resid pump blew a seal. |