Home | Search | Emissions | Pollutants | About the Database |
LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
114193 2009-04-16 | Flare No. 1, Flare No. 2 | Cause: Refinery cooling water tower CT-405 experienced a valve malfunction which resulted in a loss of cooling water to our Naphtha Hydrotreating unit (NHT). Due to the lack of cooling water, our NHT stripper overhead pressure increased and caused PSV-39-235 to relieve to the flare. Simultaneously when the CT-405 valve malfunction, the recirculating cooling water was released from the basin to the ground and flowed offsite. Followup: No Notes: | 6,000.0 gallons |
Connect With Us: