Home | Search | Emissions | Pollutants | About the Database |
LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
138173 2012-03-21 | Area C Demo Line | Cause: The root cause was found to be operator error. The operator failed to secure the line during a unit shutdown to clean equipment. Thus, some temporary piping that had been put in and left open-ended upon disconnection. Followup: No Notes: Corrective action was taken to isolate the open-ended pipe identified during the incident investigation. | 5,441.0 pounds |