LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
84111 2005-11-27 | Alkylation Unit | Cause: Pinhole leak on 8" pipe at Alkylation Unit. Followup: No Notes: Claims emission was below RQ | |
83843 2005-11-12 | Alkylation Unit | Cause: Leak in line of butane at the Alkylation Unit. Followup: No Notes: Claims emission was below RQ. Repairs planned and made. | |
82254 2005-09-16 | Alkylation Unit | Cause: Pinhole leak in the weld of a butane pipeline discovered at the Alkylation Unit. Followup: No Notes: Claims emission was below RQ. Line was isolated and a water spray from the fire monitors was applied to keep the vapors to a minimum. Air monitoring detected offsite impact. | |
81999 2005-09-07 | Cause: Lost control of skid due to light end in the feed, emergency shut down of MTB Unit resulting in a smoking flare of mixed butane Followup: No Notes: Claims emission was below RQ. Offsite impact. | ||
76801 2005-02-08 | MTBE Unit | Cause: malfunction of a tube bundle on the MTBE production unit skid put Butane in the sewer system Followup: No Notes: Flushed out the sewer system and directed into the secondary treatment facility | |
76428 2005-01-24 | #2 and #3 tank valve on Barge 10809 | Cause: vapor clous escaped from tank valve Followup: No Notes: Computer program tracks operation of valves, creates work order every 90 times valve is operated. Will inspect the valves and determine if needs to be adjuste | |
76032 2005-01-07 | unloading hose at A Dock | Cause: Ruptured hose while unloading barge Followup: No Notes: Claims emission was below RQ | |
101177 2007-11-20 | Cooling Towers 1 and 2 | Cause: tube leak in E-12 overhead condenser, C-175D at the C-4 Recovery Un Followup: No Notes: The backpressure controller set point was changed from 217 to 210 PSIG. The alarm settings will be changed to a lower setting to prevent Operations from running the tower at such an elevated pressure. | |
97781 2007-07-11 | Alkylation Unit | Cause: Followup: No Notes: A bleeder valve break at the Alkylation Unit caused emission. | |
97675 2007-07-07 | Sewer system at alkylation unit | Cause: Under Investigation Followup: No Notes: CITGO attempts to flush out sewer line to find leak; has not found it. | |
95917 2007-05-06 | 6 inch transfer line in A-dock | Cause: Followup: No Notes: Butane released from a 6 inch unloading line. Remedial action: Identified the line and the line has been depressured; the State Police Incident No. on the CITGO letter is 07-02315; the State Police Incident No. on the verbal report is 07-02316 | |
93266 2007-01-14 | Tank 15 | Cause: Followup: No Notes: Line taken out of service and depressurized; water blanket placed over leaking flange | |
117244 2009-08-13 | Tank 526 | Cause: No RQs were exceeded so no information was given. Followup: No Notes: No information given | |
117221 2009-08-11 | Tank 526 | Cause: No RQs were exceeded so no further information was given. Followup: No Notes: No information given | |
112841 2009-02-18 | B-8 Flare in C4 unit | Cause: Release of Sour Gas from B-8 flare due to the lifting of a pressure valve in the C4 Recovery unit at the CITGO Lake Charles Manufacturing Complex where the E10 tower was lifted and reset itself. Followup: Notes: C4 unit at the E10 tower reset itself. Material was discharged into surrounding area air. | |
125415 2010-08-05 | E103 tower overhead | Cause: Tubing leak in the Unicracker unit, E103 tower overhead. Leak was discovered during a routine maintenance check of equipment. Followup: No Notes: Blocked tubing, depressurized line. |