Accident # | 101177 |
State Police # | 07-07088 |
Accident Date | 2007-11-20 |
Report Date | 2007-11-26 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Sulfur Dioxide | 6 h 37 m | Cooling Towers 1 and 2 | NO | YES | NO | 6,517.0 pounds |
Hydrogen Sulfide | 6 h 37 m | Cooling Towers 1 and 2 | NO | NO | NO | BRQ |
Volatile Organic Compounds (VOCs) | 6 h 37 m | Cooling Towers 1 and 2 | NO | NO | YES | 89.0 pounds |
Nitrogen Oxide | 6 h 37 m | Cooling Towers 1 and 2 | NO | YES | YES | 43.0 pounds |
Carbon Monoxide | 6 h 37 m | Cooling Towers 1 and 2 | NO | YES | NO | 236.0 pounds |
Butane | 6 h 37 m | Cooling Towers 1 and 2 | NO | NO | YES | BRQ |
Propane | 6 h 37 m | Cooling Towers 1 and 2 | NO | NO | YES | BRQ |
Accident Classified As:
tube leak in E-12 overhead condenser, C-175D at the C-4 Recovery Un
The backpressure controller set point was changed from 217 to 210 PSIG. The alarm settings will be changed to a lower setting to prevent Operations from running the tower at such an elevated pressure.