Home | Search | Emissions | Pollutants | About the Database |
Accident # | 129829 |
PDF Available | ![]() |
State Police # | 11-01370 |
Accident Date | 2011-03-11 |
Report Date | 2011-03-17 |
Follow-up Date | 2011-11-09 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Butadiene | 10 m | valve on #2 flash tank | NO | NO | YES | 58.8 pounds |
Accident Classified As: Reportable Quantity
58.8 pounds of butadiene was released and the RQ was exceeded as a result of a leaking valve on #2 flash tank.
Non-preventable upset condition.
The leak was small enough that it was not identified by the maintenance technician removing the blind or by the process technician reomving
Connect With Us: