Home | Search | Emissions | Pollutants | About the Database |
Accident # | 128380 |
State Police # | 10-07354 |
Accident Date | 2010-12-29 |
Report Date | 2011-01-05 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Ethylene | 1 h 42 m | knockout drum KD-05 on Ethylene Clarification unit | NO | NO | YES | 304.0 pounds |
1,3-Butadiene | 1 h 42 m | knockout drum KD-05 on Ethylene Clarification unit | NO | NO | YES | 13.0 pounds |
Benzene | 1 h 42 m | knockout drum KD-05 on Ethylene Clarification unit | NO | NO | YES | 16.0 pounds |
Accident Classified As: Reportable Quantity
A knockout drum KD-05 on the Ethylene Clarification unit was experiencing high liquid levels. This increase in material in the quench water drum resulted in a disruption of quench water flow and led to increasing unit temperatures. Compressor HC-01 then tripped due to high temperature which caused unit material to be routed to the flare system, by design, until the compressor could be restarted.
To reduce the liquid levels quickly, operations personnel opened a bypass valve and routed material to a downstream quench water drum, HD-02. The RQs for ethylene, benzene, and 1-3 butadiene were exceeded. There was a light precipitation at the time of the event. This incident and responses to potential future incidents will be reviewed with operations personnel.
Connect With Us: