ExxonMobil Refinery (2638), Baton Rouge

LDEQ Accident Report

Accident #134110
State Police #11-05900
Accident Date2011-09-22
Report Date 2011-09-29
Follow-up Date 0000-00-00
Follow-up: No

Pollutants Released

Pollutant Duration Point Source Greenhouse Gas Criteria Pollutant Ozone forming chemical Amount of Release
Oil3h 23mUnderground crude lineNONONO494.6 gallons
Volatile Organic Compounds (VOCs)3h 23mUnderground crude lineNONOYES4,813.0 pounds
Benzene3h 23mUnderground crude lineNONOYES59.0 pounds
Naphthalene3h 23mUnderground crude lineNONOYES179.0 pounds

Accident Classified As: Reportable Quantity

Cause of Problem: Piping or Tubing

Oil was discovered on the ground, and excavation revealed that there was a pinhole leak in an underground crude line.

Discharge Preventable - Yes

Notes/Remedial Actions

Vacuum trucks were used to remove oil, soil was being re-mediated, and a clamp was placed on the pipe to prevent further release. All of the release was contained onsite.5051lbs of total VOC released with the addition of Benzene and Naphthalene at 59 lbs and 179 lbs respectively. The Total of Other VOCs that do not include Benzene and Naphthalene is 4813lbs but still exceeds the reportable quantity for the EPA and LDEQ. RQ for Oil is 42gal, Benzene is 10 lbs, VOC is 5000 lbs, and Naphthalene is 100 lbs.