Home | Search | Emissions | Pollutants | About the Database |
Accident # | 104689 |
State Police # | 08-02032 |
Accident Date | 2008-04-13 |
Report Date | 2008-04-18 |
Follow-up Date | 2000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Benzene | 7h 28m | 5-77 (St. Rose Flare) | NO | NO | YES | 0.1 pounds |
Carbon Monoxide | 7h 28m | 5-77 (St. Rose Flare) | NO | YES | NO | 113.0 pounds |
Ethylbenzene | 7h 28m | 5-77 (St. Rose Flare) | NO | NO | YES | BRQ |
Nitrogen Oxide | 7h 28m | 5-77 (St. Rose Flare) | NO | YES | YES | 20.8 pounds |
Particulate Matter | 7h 28m | 5-77 (St. Rose Flare) | NO | YES | NO | 3.9 pounds |
Sulfur Dioxide | 7h 28m | 5-77 (St. Rose Flare) | NO | YES | NO | 1.0 pounds |
Toluene | 7h 28m | 5-77 (St. Rose Flare) | NO | NO | NO | 0.0 pounds |
Volatile Organic Compounds (VOCs) | 7h 28m | 5-77 (St. Rose Flare) | NO | NO | YES | 16.9 pounds |
Xylene | 7h 28m | 5-77 (St. Rose Flare) | NO | NO | NO | 0.0 pounds |
n-Hexane | 7h 28m | 5-77 (St. Rose Flare) | NO | NO | NO | 1.1 pounds |
Accident Classified As:
Power interruption caused by fire at Entergy substation feeding the plant. Lead to shutdown of plant and flaring.
The power interruption from Entergy was not foreseeable and the equipment was restarted once power was returned. The incident will be reviewed with Entergy and any appropriate corrective actions will be implemented to prevent reoccurrence
Connect With Us: