Home | Search | Emissions | Pollutants | About the Database |
LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
92424 2006-12-05 | analyzer diaphragm | Cause: An analyzer diaphragm blew out causing material to be released. Followup: Notes: They blocked in the analyzer. They will leave it blocked in and will get it repaired | 1,113.5 pounds |
105931 2008-05-25 | Line leak on Carbon scrubber tower | Cause: Internal corrosion was the cause of the leak Followup: No Notes: Will exceed over one thousand pounds per hour. Shut down the unit and depressurized to stop leak. Leaking portion of the line was replaced. | 4,610.0 pounds |
105082 2008-04-25 | reactor head | Cause: Advised of leak of "SYNTAS" on reactor head doing shut down. Followup: No Notes: Previous report estimated the hole as 1/4" and calculated release of 2331 lbs syngas. However further investigation revealed that the size of the hole was 1/16" and released 146 lbs syngas. | 146.0 pounds |
Connect With Us: