Home | Search | Emissions | Pollutants | About the Database |
LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
No LDEQ Reported 2005-01-21 | Alkyation Unit | Cause: Incident was caused by a failure of a site glass on a process vessel. Result of equipment failure Followup: No Notes: the affected area (valves) was manually blocked in and the site glass is being rebuilt to prevent reoccurence. | 15.0 pounds |
132636 2011-07-22 | FLARE: FCC unit | Cause: The main air blower tripped in the FCC unit. Because the feed was pulled from the unit there was potential for a release. Followup: No Notes: They were bringing the unit back up and waiting for stabilization. |
Connect With Us: