Home | Search | Emissions | Pollutants | About the Database |
LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
128963 2011-02-01 | Pressure Swing Adsorber Refinery Heaters | Cause: Flaring due to unplanned shutdown of Pressue Swing Adsorber (PSA) system. Oxygen analyzer on VPS-2 Atm Heater went into alarm due to composition change in fuel gas caused by PSA's startup. Additionally, a malfunctioning pressure controller within the Amine regeneration Unit caused the kick back valve on the amine pump. Followup: Yes Notes: BRQ. No information given. |
Connect With Us: