Home | Search | Emissions | Pollutants | About the Database |
LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
109344 2008-09-19 | pull down line going to sewer from the Alkylation unit | Cause: A pinhole leak in a pull down line going to sewer from the Alkylation unit released vapors. Followup: No Notes: Insulation was removed from the line to initiate repairs. Release is BRQ. | |
133873 2011-09-11 | Safety Valve Discharge Header Piping weld | Cause: LDEQ received written notification from ExxonMobil Baton Rouge Refinery that there was a release of 200 pounds of flammable vapor due to a pin hole in a weld on a safety valve discharge header piping. Followup: No Notes: This release is BRQ. | 200.0 pounds |
130816 2011-04-24 | Tube Valve On Exchanger | Cause: LDEQ states that an unknown quantity of oil was released when an operator was doing a pressure survey. A one half inch tube valve on an exchanger failed, resulting in the spill. Approximately 208 pounds of vapor were released. Followup: No Notes: This release was BRQ. The oil was cleaned. | 208.0 pounds |
129868 2011-03-13 | Flange | Cause: A flange leak released approximately 184 pounds of flammable vapor. Followup: No Notes: This release is BRQ. | 184.0 pounds |
Connect With Us: