Home | Search | Emissions | Pollutants | About the Database |
LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
No LDEQ Reported 2008-08-19 | Thermal Hydrodealkylation Unit (1792) | Cause: Followup: Yes Notes: Planned shutdown occurred to repair problms with the Thermal Hydrodealkylation Unit. Courtesy Call. Verbal report was made but no written report followed. | |
136882 2012-02-01 | 1391-FF (1391-PSV-009) | Cause: There was an unexpected increase in the Depantanizer tower's overhead pressure causing PSV-009 to relieve. This was the result of the shutdown of the reboiler due to high burner pressure. Followup: No Notes: The reboiler (1391-H-4) temperature was lowered which lowered the pressure in the Depantanizer Tower allowing 1391-PSV-009 to reseat. There is no LDEQ report and no SPOC report attached to this file. 19,570 pounds released | 485.7 pounds |
Connect With Us: