LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
83416 2005-10-26 | FCC EP-41 | Cause: Incident due to unit start-up following Hurricane Rita. Followup: No Notes: release ended once FCC start-up was completed. Notice made as courtesy only. No reportable limits for Carbon Monoxide and the exceedance will be reported on refinery's quarterly New Source Performance Standards/Best Available Control Technology Report. | No Information Analy |
78700 2005-05-03 | FCC Stack (EP-41) | Cause: No Information Given Followup: Notes: No reportable limits for Carbon Monoxide, and exceedance will be reported on refiner's quarterly NSPS/BACT Report in the near future. Notice made as courtesy only. | |
85804 2006-02-14 | FCC Stack (EP-41) | Cause: Exceedance of CO from the FCC Stack due to start- Followup: Yes Notes: The permit exceedance will be reported in the next quarterly New Source Performance Standard/Best Available Control Technology Report. | |
97829 2007-07-13 | North Flare | Cause: see notes Followup: No Notes: a root cause failure analysis will be completed to determine the cause of the equipment failure. Once emissions were noticed, unit was shut dow | 2,191.0 pounds |
92923 2006-12-29 | North Flare | Cause: wet gas compressor tripped and shut down Followup: No Notes: Facility is conducting root cause failure analysis to prevent future recurrence and ensure extra insulation on the bus is adequate during shutdowns | 1,302.0 pounds |