Accident # | 131959 |
tate Police # | N/A |
Accident Date | 2012-06-20 |
Report Date | 2012-06-23 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Steam | NIG | NIG | NO | NO | NO | BRQ |
Accident Classified As: Below Reportable Quantity (BRQ)
Citizen noise complaint. Facility representative explained the facility is adjusting the pressure swing absorber tail gas compressor which requires venting some hydrogen to the flare, requiring some steam to be sent to the flare to control combustion.
Two citizen complaints were made: 6/20/11 at 7:19 am Noise complaint of sounds like an airport-loud roar had lasted throughout the night and is still present at 6:20 on 6/20/11. The noise is audible in house. 6/20/11 at 8:27 am: mid to late afternoon into late night evening was a flaring event. It was a very tall, very narrow, medium orange flame on north flare. The facility is adjusting the steam ratios to reduce the noise.