Home | Search | Emissions | Pollutants | About the Database |
Accident # | 142365 |
State Police # | 12-05734 |
Accident Date | 2012-08-27 |
Report Date | 2012-09-10 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Unknown Substance | NIG | NIG | NO | NO | NO | BRQ |
Accident Classified As: Below Reportable Quantity (BRQ)
On Monday September 27, 2012 at approximately 08:30 hrs, we made notification. that we will experience a controlled shutdown due to the proximity of Hurricane Isaac. Any emissions associated with this controlled shutdown were within the allowable permit limits.
There is no list of pollutants released/calculations table (there should be even when it is within permit limits). Without this there is no proof that the release was within permit limits. From the EPA Facility Report: Storm water collected within diked areas. Some electrical motors got wet; motors were operationally checked prior to startup. Facility is undergoing startup. There was a power outage due to Hurricane Isaac.
Connect With Us: