Accident # | 134114 |
PDF Available | ![]() |
State Police # | 11-05890 |
Accident Date | 2011-09-22 |
Report Date | 2011-09-28 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Diethylbenzene | 15m | From a pipe. | NO | NO | YES | 5.5 pounds |
Accident Classified As: Below Reportable Quantity (BRQ)
There was a mechanical failure in the piping system, causing a leak.
The LDEQ report states that this was an unplanned event.
The spilled material was contained within a concrete containment area. Then, it was recovered and cleaned up. The release to the air was calculated at 5.5 lbs.