Home | Search | Emissions | Pollutants | About the Database |
Accident # | 143828 |
State Police # | 12-06803 |
Accident Date | 2012-10-15 |
Report Date | 2012-10-19 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Propylene | None given | tube on the RLA3 Unit | NO | NO | YES | 5.8 pounds |
Accident Classified As: Below Reportable Quantity (BRQ)
on 10/15/12 at approximately 09:54, EMCP had a tube leak in the RLA3 unit. A clamp was put on the leak, but there was still a small leak around the clamp.
Air monitoring showed 2000 ppm at the site of the leak. A clamp was placed on the leak but there is still a small leak arounf the clamp. No RQs were exceeded, and approximately 5.8 lbs of propylene were released as a result of the event.