Home | Search | Emissions | Pollutants | About the Database |
Accident # | 136936 |
State Police # | 12-00651 |
Accident Date | 2012-02-02 |
Report Date | 2012-02-07 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Flammable Vapor | 2h 36m | Flow meter lead line | NO | NO | YES | 176.4 pounds |
Accident Classified As: Below Reportable Quantity (BRQ)
Operator discovered a pinhole leak on a flow meter lead line, which was releasing propane.
The line was isolated and depressured. In the initial report, it was estimated that more than 1000 pounds of propane were released. However, after further evaluation, ExxonMobil determined that no reportable quantities were exceeded.