Placid Refining (2366), Port Allen

LDEQ Accident Report

Accident #133455
State Police #11-05133
Accident Date2011-08-23
Report Date 2011-08-24
Follow-up Date 0000-00-00
Follow-up: No

Pollutants Released

Pollutant Duration Point Source Greenhouse Gas Criteria Pollutant Ozone forming chemical Amount of Release
Smoke6 hFlareNONONOBRQ

Accident Classified As: Below Reportable Quantity (BRQ)

Cause of Problem: Process Upset

Reformer Compressor shutdown due to electric failure.

Discharge Preventable - No

The use of the flare system to control the process upset was not preventable because the compressor shutdown was not planned. The flare gas recovery system was overwhelmed by the volume of process gas sent to the system and flaring to safely control emissions was necessary.

Notes/Remedial Actions

Process upset was routed to the flare for release control. Operations safely shutdown the reformer unit and switched downstream unit to pipeline hydrogen.