Accident # | 136618 |
State Police # | 12-00374 |
Accident Date | 2012-01-20 |
Report Date | 2012-01-25 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Distillate | 5m | Upper level of Coker Unit | NO | NO | YES | 3,081.3 pounds |
Accident Classified As: Below Reportable Quantity (BRQ)
A tube had a circumferential crack that propagated halfway around one tube in the Distillate Product Fin Fan, 205-1351. Unit 205 GME Delayed Coker (FUG 0053).
There was an incident investigation underway at the time of the report.
The unit was shutdown to minimize and stop the leak. Water monitors were aimed at the leak to suppress vapors. Air monitoring occurred. A vacuum truck, boom, and absorbent pads were used to remove light sheen found in the rain water ditch on the east side of Marathon Avenue adjacent to the unit.