Home | Search | Emissions | Pollutants | About the Database |
Accident # | 118804 |
State Police # | 09-05767 |
Accident Date | 2009-10-17 |
Report Date | 2009-10-23 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Sulfur Dioxide | 2h | flare #2 | NO | YES | NO | 1,172.0 pounds |
Accident Classified As:
Level indicator in the Light Ends Plant over head had malfunctioned. Causing the #3 Pretreater and Hydrocracker (HCU) 1st Stage Stripper overhead off gas flow to suddenly decrease. This caused the pressure to increase and release emissions through flaring (#2).
Sudden failure of a level indicator from insufficient glycerin levels could nto have been prevented.
Lowered drum level and stablizied the HCU and PT 3. Repaired indicator by refilling leg with glycerin.
Connect With Us: