Valero (1238), Meraux

LDEQ Accident Report

Accident #93741
State Police #No Information Given
Accident Date2007-02-05
Report Date 2007-02-08
Follow-up Date 0000-00-00
Follow-up: Yes

Pollutants Released

Pollutant Duration Point Source Greenhouse Gas Criteria Pollutant Ozone forming chemical Amount of Release
Sulfur Dioxide8mFLARE- Boiler feed water steam turbine pumpNOYESNO157.0 pounds

Accident Classified As:

Cause of Problem: Process Upset

there was a trip in the boiler feed water steam turbine pump. The backup electric pump auto started as designed but before the water level in the boiler was back to normal, there was an event that released listed amount of S02 from the flare. This is considered to be a process upset

Discharge Preventable -

Notes/Remedial Actions

Verbal Report - There is no information as to whether this accident was preventable or not. There is no information regarding any remedial measures that have been taken in regards to this incident. Note: the LDEQ writes this concerning the flare, The flare does operate as designed and at times is noisy and smokey.