LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
148901 2013-05-16 | West Ops Elevated Flare | Cause: On May 17,a release of carbon monoxide, ethane, and methane occurred due to flaring from a GO-1 unit upset caused by a De-methanizer shutdown. Unit feed composition caused unanticipated low temperature issues leading to a unit shutdown. Followup: No Notes: GO-1 operations took the necessary steps to safely return the unit to normal operating conditions and minimize flaring. Procedures will be updated to provide guidance and operational measures to restore normal operations after a unit shutdown. | 719.3 pounds |