Alon Refining (3116), Krotz Springs

Releases of No Information Given

LDEQ Accident Number
Accident Date
Point Source(s) Notes Amount of Release
No LDEQ Reported

2009-01-27
No information given
Cause: Shutting down refinery.

Followup: No

Notes: Report does not indicate the reason for shut down. The report also does not specify which pollutant was released or the amount of the release.
No LDEQ Reported

2010-01-11
FCC Flare EPN 5-85
Cause: Potential excess emissions from FCC Flare due to a power failure causing Complex II to shutdown.

Followup: Yes

Notes: An initial written report was sent on January 17 but is missing. Since the startup was delayed the incident was not closed out. The final all-clear notification was made. Indicated that after all units are returned to normal operations, a follow-up report was promised but is missing. Also, as part of this report, an attachment with estimated emissions was missing.
No LDEQ Reported

2007-10-15
Shut down of FCCU Unit
Cause: xxxxxxxx

Followup: no

Notes: Need to find LDEQ #. Report said that the unit was back online 10/18/05-which is probably a typo.
No LDEQ Reported

2007-06-04
equipment malfunction in FCCU (Complex II)
Cause: Start Up, Shut Down - Due to equipment malfunction

Followup: no

Notes: The unplanned shutdown was caused by an equipment malfunction and daily updates were made until unit was secured.
No LDEQ Reported

2008-08-29
No information given
Cause: xxxxxxxx

Followup: No information given

Notes: The plant had an unplanned shutdown in anticipation of Hurricane Gustav.
No LDEQ Reported

2008-08-25
LPG Piping leak
Cause: xxxxxxxx

Followup: No information given

Notes: A compressed flammable gas was released due to a LPG piping leak but it was well below the 1000lb RQ.