Placid Refining (2366), Port Allen

Releases of Smoke

LDEQ Accident Number
Accident Date
Point Source(s) Notes Amount of Release
No LDEQ Reported

2008-09-16
FLARE w/smoke
Cause: Start up of FCC unit

Followup: No

Notes: no information given
No LDEQ Reported

2008-08-26
Valve on heat exchanger
Cause: Maintenance error during turnaround

Followup: No

Notes: Vent line valve left open causing crude to ignite. Reiterated startup procedures to operators
133455

2011-08-23
Flare
Cause: Reformer Compressor shutdown due to electric failure.

Followup: No

Notes: Process upset was routed to the flare for release control. Operations safely shutdown the reformer unit and switched downstream unit to pipeline hydrogen.