LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
134363 2011-10-05 | Unit 15 Heavy Gas Oil Hydrotreater | Cause: A 3/4 inch bleeder valve failed on the Reactor Charge Startup Bypass Line while process equipment was being cleaned with LCO. There was no known off-site impact. An incident investigation is being conducted to determine why the incident occurred. LCO was released to and contained to the concrete slab of the Unit. Followup: No Notes: The line was allowed to depressure to the flare until the pressure on the line was atmospheric. LCO was processed in the onsite Waste Water Treatment Plant. An incident investigation will result in recommendation items designed to prevent the recurrence of this event. | 3,112.2 gallons |