Home | Search | Emissions | Pollutants | About the Database |
LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
101225 2007-11-23 | B-12 Flare | Cause: loss of JC1A Compressor at unicracker unit Followup: No Notes: CITGO letter states that no RQ's were exceeded | |
109637 2008-09-29 | B-12 Flare | Cause: Followup: No Notes: A-SRU experience swings in air demand caused by hydrocarbon carryover from the A Sour Water Tower (E301A). Flow from E-301 to A-SRU was stopped, then restarted. Startup was cause of release. Stopped again. Another start up released even more SO2. REMEDIAL ACTIONS: Upgrade existing suge tank skim oil pumps, Add third surge tank skim oil pump, install instrumentation to detect hydrocarbons in SWS feed | |
106260 2008-06-07 | B-5 Flare | Cause: Followup: No Notes: Valve leak in ALCOH Unit | |
114679 2009-05-04 | B-8 flare | Cause: BLCOH unit compressor pressure relief valve lifted releasing hydrogen sulfide, nitrogen oxide and sulfur dioxide into the B-8 flare Followup: No Notes: gases burned in flare and release "secured" | |
115679 2009-05-04 | B-8 flare | Cause: BLCOH unit compressor pressure relief valve lifted releasing hydrogen sulfide, nitrogen oxide and sulfur dioxide into the B-8 flare Followup: No Notes: gases burned in flare and release "secured" |
Connect With Us: