LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
81597 2005-08-23 | B-12 FLARE | Cause: Outage of JC-1B recycle Hydrogen Compressor at Unicracker Unit. Followup: No Notes: Claims emission was below RQ | |
80604 2005-07-25 | B-12 Flare | Cause: flaring of excess hydrogen during outage of JC-1B recycl Hydrogen Compressor at Unicracker Unit Followup: No Notes: Claims emission was below RQ. Shut unit down and repaired compressor | |
86306 2006-03-08 | A Reformer Unit | Cause: piping leak at the A-Reformer Unit Followup: No Notes: No Information Given | |
95930 2007-05-05 | B-11 Flare (EIQ No. 3(XXII)4) and (ID No. EQT 350) | Cause: pilot outages of B11 Flare - malfunctioning pressure regulator on nat. gas to pilots Followup: No Notes: Emissions exceeded RQ of 100 lbs. operator checks on gas line pressure downstream; development of a routine schedule for maintenance checks on the regulator; instrument group has repaired pressure regulator that malfunctioned. | |
125480 2010-08-09 | isom unit | Cause: Flange leak in the Isomerization unit--no further details
no DEQ report in this file Followup: No Notes: "Citgo personnel are making repairs", no specifics given. | |
123858 2010-05-30 | C103 Exchanger | Cause: Fire from hydrogen leak from a bad gasket at C103 exchanger--burned about 10min. Followup: No Notes: Line depressurized to B9 flare and unit shut down. "Plant performed perimeter monitoring and had no readings." No Refinery letter included. Only LDEQ verbal report. | |
123188 2010-05-02 | B12 flare | Cause: The JC 1C Compressor over-pressurized causing relief valve to open to B-12 flare. Followup: No Notes: No information given | |
122168 2010-03-17 | B-12 flare | Cause: Swapping out compressors, overloaded system, valve released to flare Followup: No Notes: no information given |