Home | Search | Emissions | Pollutants | About the Database |
LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
131594 2011-06-05 | Outfall 003; Outfall 210 | Cause: Outfall 003 cooling water system line developed a leak and discharging commenced to Contaminated Stormwater Outfall 210 to prevent equipment and property damage. Followup: No Notes: BRQ. Refinery letter states that effluent permit limits were not exceeded for Outfall 003 or Outfall 210. A clamp was installed on the leaking pipe to mitigate the volume of water being discharged via Storm water 210 outfall. The affected piping will be isolated and repaired/replaced. | 1,268,400.0 gallons |
Connect With Us: