LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
112486 2009-02-03 | No Information Given | Cause: No Information Given Followup: No Notes: Below reportable quantities. | |
112486 2009-02-03 | No Information Given | Cause: No Information Given Followup: No Notes: No Information Given | |
126163 2010-09-06 | FCC regenerator flue gas scrubber vent FLARE: Thox stack, Flare # 1 and 2 FLARE: Flare #1 | Cause: Bus bar short to ground due to unsealed air gaps created a voltage dip which resulted in power loss to multiple units which then had to flare. Pressure imbalance in the FCC regenerator resulted in loss of catalyst through the regenerator flue gas scrubber vent. FLARE. Followup: Yes Notes: "To reduce the likelihood of recurrence, sealant was installed between the bus bars and supports in PS 7711 and acoustic inspection is being performed at another power station that was designed and installed by the same contractor." Refinery letter states that "there was no emergency condition related to this release and the resulting community exposures would not be expected to have acute or chronic health impacts." | 38,000.0 pounds |
Connect With Us: