128245

2010-07-09
piping in VCM unit
Cause: A pinhole leak was discovered in the process piping and a valve in the VCM Unit. The pinholes in the metal of the affected piping/valve was likely caused by internal corrosion.

Followup: No

Notes: The affected piping/valve was scheduled for an internal inspection during outages. It will be re-emphasized to affected personnel the importance of accurate information in release estimations and proper inspection and maintenance of equipment. Actions were taken to isolate and stop the leak. The affected equipment was shutdown, de-inventoried, and repaired.
Carbon tetrachloride: 11.1 pounds
Chloroform: 22.9 pounds
140294

2012-06-06
1.5 inch furnace nozzle
Cause: 1.5 inch furnace nozzle was leaking vinyl chloride due to corrosion of the nozzle

Followup: No

Notes: The furnace was shut down. Leak was expected to be stopped within 1-2 hours. Amount of chemical released is unknown. The release was not in exceedance of a reportable quantity.
amount released unkn