Home Search Emissions Pollutants About the Database


Alon Refining (3116), Krotz Springs

LDEQ Accident Report

Accident #159509
State Police #14-04711
Accident Date2014-10-18
Report Date 2014-10-24
Follow-up Date 0000-00-00
Follow-up: No

Pollutants Released

Pollutant Duration Point Source Greenhouse Gas Criteria Pollutant Ozone forming chemical Amount of Release
Sulfur DioxideNo information givenBoiler B-8203NOYESNO1,469.0 pounds
Carbon MonoxideNo information givenBoiler B-8203NOYESNOBRQ

Accident Classified As: Reportable Quantity

Cause of Problem: Instrument Failure

B-8203 boiler tripped due to an instrument malfunction followed by a B-8204 boiler trip due to low boiler feed water. Loss of boiler steam caused the FCCU to trip, resulting in excess emissions from the Fluid Catalytic Cracking Unit (FCCU) stack and Complex 2 flare.

Discharge Preventable - No Information Given

Notes/Remedial Actions

FCCU and all adjoining units in Complex 2 were shutdown along with the LRU, MSAT and Isom at Complex 1. System cleared and emissions stopped. Boilers repaired then units brought back on line per startup procedures.