Home | Search | Emissions | Pollutants | About the Database |
Accident # | 146138 |
State Police # | 13-00251 |
Accident Date | 2013-01-17 |
Report Date | 2013-01-25 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Nitrogen Oxide | 3h 44m | Unit 259 North Ground Flare | NO | YES | YES | 89.6 pounds |
Carbon Monoxide | 3h 44m | Unit 259 North Ground Flare | NO | YES | NO | 487.3 pounds |
Volatile Organic Compounds (VOCs) | 3h 44m | Unit 259 North Ground Flare | NO | NO | YES | 1,138.0 pounds |
Particulate Matter 10 | 3h 44m | Unit 259 North Ground Flare | NO | YES | NO | 9.8 pounds |
Particulate Matter 2.5 | 3h 44m | Unit 259 North Ground Flare | NO | YES | NO | 9.8 pounds |
Highly Reactive Volatile Organic Compounds | 3h 44m | Unit 259 North Ground Flare | NO | NO | YES | 1.3 pounds |
Methane | 3h 44m | Unit 259 North Ground Flare | YES | NO | YES | 96.1 pounds |
Ethane | 3h 44m | Unit 259 North Ground Flare | NO | NO | YES | 11.9 pounds |
Ethylene | 3h 44m | Unit 259 North Ground Flare | NO | NO | YES | 0.7 pounds |
Propane | 3h 44m | Unit 259 North Ground Flare | NO | NO | YES | 75.7 pounds |
Propylene | 3h 44m | Unit 259 North Ground Flare | NO | NO | YES | 0.6 pounds |
n-Butane | 3h 44m | Unit 259 North Ground Flare | NO | NO | NO | 565.1 pounds |
Isobutane | 3h 44m | Unit 259 North Ground Flare | NO | NO | YES | 442.3 pounds |
1-Butene | 3h 44m | Unit 259 North Ground Flare | NO | NO | YES | 3.4 pounds |
Pentene Plus | 3h 44m | Unit 259 North Ground Flare | NO | NO | NO | 46.0 pounds |
Carbon Dioxide | 3h 44m | Unit 259 North Ground Flare | YES | NO | NO | 3.4 pounds |
Hydrogen | 3h 44m | Unit 259 North Ground Flare | NO | NO | NO | 3.2 pounds |
Nitrogen | 3h 44m | Unit 259 North Ground Flare | NO | NO | NO | 7.4 pounds |
Accident Classified As: Below Reportable Quantity (BRQ)
Unit 222 Sats Gas Plant experienced an upset due to an over-pressure condition on the debutanizer column. As a result, pressure relief valves lifted, sending debutanizer overhead material to the refinery's North Ground Flare. Root cause was a faulty pressure transmitter.
According to their letter from january 23, 2013, "NA; the event does not reach the level of a reportable release."
The Board Operator decreased pressure on the debutanizer column. The faulty transmitter was replaced. Initial reports from January, 2013 stated no permit limits were exceeded concerning released pollutants. Final calculations from April 4, 2013 determined otherwise.