Home | Search | Emissions | Pollutants | About the Database |
Accident # | 126833 |
State Police # | 10-05758 |
Accident Date | 2010-10-03 |
Report Date | 2010-10-07 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Propylene | 2 d 16 h 15 m | compressor piping | NO | NO | YES | 278.0 pounds |
Accident Classified As: Reportable Quantity
The Ethylene Purification Unit was being surveyed using an optical imaging "HAWK" camera when a pinhole leak was detected coming from a pipe.
The release was due to unanticipated corrosion.
On 10/3/10 around 8:15 pm the plant experienced a propylene release. Because of the location of the release, scaffolding was required to allow access of the pipe. A clamp was installed on the pipe, which ended the release. A permanent repair was being evaluated. The release was due to unanticipated corrosion. RQs for propylene were exceeded.