Home | Search | Emissions | Pollutants | About the Database |
Accident # | 123193 |
State Police # | No Information Given |
Accident Date | 2010-05-03 |
Report Date | 2010-05-10 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Propylene | 18 d 3 h 30 m | Exchanger-18X | NO | NO | YES | 7,258.0 pounds |
Volatile Organic Compounds (VOCs) | 18 d 3 h 30 m | Exchanger-18X | NO | NO | YES | 6,678.0 pounds |
Accident Classified As: No Information Given
On 4/15/10 the Baton Rouge Complex sampled cooling tower #33 for MACT CC compliance using the El Paso cooling tower sample method, as required by refinery operations. Cooling tower #33 is located in the refinery and services both refinery and chemical plant units. The sample results from 4/15 showed more hydrocarbon than expected, so the tower was resampled on 4/16. These results also indicated a hydrocarbon leak.
The unit personnel began looking for the source under the premise that the release had to be repaired within 45 days, as required by MACT CC. On 4/3/10, the leaking exchanger (E-18X) was identified as the leak source. The exchanger is part of the Baton Rouge Chemical Plant so MACT CC provisions do not apply. Once the leaking exchanger was identified, the release calculations were updated based on the actual stream speciation. These updated calculations relevealed that the release was larger than orginially calculated using the EL Paso method and exceeded the reportable quantity for propylene. RQ for VOC was not exceeded. The exchanger bundle will be repaired before returning to service. Cooing tower MACT CC sampling procedures will also be updated for cooling towers that service both refinery and chemical plant units. Caused by an unforseen exchanger leak. Release of HRVOC during ozone reason, will take up upon next inspection.