Accident # | 137083 |
State Police # | 12-00797 |
Accident Date | 2012-02-09 |
Report Date | 2012-02-16 |
Follow-up Date | 2012-03-22 |
Follow-up: | Yes |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Heavy Naphtha | 11m | RCCU | NO | NO | NO | BRQ |
Benzene | 11m | RCCU | NO | NO | YES | BRQ |
Compressed Flammable Liquid | 11m | RCCU | NO | NO | YES | BRQ |
Volatile Organic Compounds (VOCs) | 11m | RCCU | NO | NO | YES | BRQ |
Accident Classified As: Below Reportable Quantity (BRQ)
During normal operations, there was an unexpected opening of a relief valve (RV) on the RCCU Main Fractionator, causing a release from the Residual Catalytic Cracking Unit (RCCU). The Naphtha was released to the concrete below the unit.
Operations responded immediately to isolate the RV, and the release was stopped. The Naphtha was cleaned immediately. The main Fractionator column pressure remained steady prior to release. After the investigation was completed, the facility took precautionary measures and reinstalled the relief valve to prevent further occurrence.