Accident # | 134363 |
State Police # | 11-06187 |
Accident Date | 2011-10-05 |
Report Date | 2011-10-07 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Light Cycle Oil | 4 m | Unit 15 Heavy Gas Oil Hydrotreater | NO | NO | YES | 3,112.2 gallons |
Accident Classified As: Below Reportable Quantity (BRQ)
A 3/4 inch bleeder valve failed on the Reactor Charge Startup Bypass Line while process equipment was being cleaned with LCO. There was no known off-site impact. An incident investigation is being conducted to determine why the incident occurred. LCO was released to and contained to the concrete slab of the Unit.
Not known at this time. The results of the incident investigation will determine whether or not this was preventable.
The line was allowed to depressure to the flare until the pressure on the line was atmospheric. LCO was processed in the onsite Waste Water Treatment Plant. An incident investigation will result in recommendation items designed to prevent the recurrence of this event.