Home | Search | Emissions | Pollutants | About the Database |
Accident # | 129077 |
State Police # | 11-00656 |
Accident Date | 2011-02-06 |
Report Date | 2011-02-10 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Hydrogen Sulfide | 9m | C-Cat PC152 Instrument | NO | NO | NO | BRQ |
Sulfur Dioxide | 9m | C-Cat PC152 Instrument | NO | YES | NO | BRQ |
Accident Classified As:
State police report states that the C-Cat PC152 instrument failure caused over-pressurization of the E1 Fractionator.
BRQ. Refinery letter states that "review of operating data showed that no RQ were exceeded." Pressure was relieved by releasing the hydrogen sulfide and sulfur dioxide to the B-7 Flare. Refinery letter and SPOC report only. No LDEQ report.
Connect With Us: