Home Search Emissions Pollutants About the Database


ExxonMobil Refinery (2638), Baton Rouge

LDEQ Accident Report

Accident #128351
State Police #10-07321
Accident Date2010-12-27
Report Date 2011-01-03
Follow-up Date 0000-00-00
Follow-up: No

Pollutants Released

Pollutant Duration Point Source Greenhouse Gas Criteria Pollutant Ozone forming chemical Amount of Release
Sulfur Dioxide15 mFlares #17 and #19NOYESNO1,127.0 pounds

Accident Classified As: Reportable Quantity

Cause of Problem: Process Upset

The alkylation unit was being shutdown and a compressor at the hydrocracker unit was starting up, this helped the flare gas recover unit to receive higher than normal hydrocarbon vapor rates. This exceeded the vapor recovery system capacity leading to temporary flaring of flare #17 and #19, and the leaking of sulfur dioxide.

Discharge Preventable - Yes

"This incident was preventable and exceeded a RQ, therefore it will be further investigated during the next compliance inspection"

Notes/Remedial Actions

"Unit operations were adjusted to end the flaring." "Increased monitoring will be conducted on gas vent rates to prevent recurrence"