Home | Search | Emissions | Pollutants | About the Database |
Accident # | 91249 |
State Police # | 06-06337 |
Accident Date | 2006-10-10 |
Report Date | 2006-10-16 |
Follow-up Date | 2000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Hydrocarbon | 6h 18m | 308F-D-1 Low Pressure Flare | NO | NO | YES | 904.8 pounds |
Accident Classified As:
The water boot control valvve for the straight run debutanizer malfunctioned and at the same time the water boot level indicator malfunctioned and began transmitting false levels
Stabilized using the manual by-pass and a replacement control valve was ordered and hot shot shipped to the refinery. The replacement control valve was installed that same evening. The level indicator was checked, cleaned and placed back in service.
Connect With Us: