Home | Search | Emissions | Pollutants | About the Database |
Accident # | No LDEQ Number Available |
State Police # | 08-00814 |
Accident Date | 2008-02-12 |
Report Date | 2008-02-19 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Hydrogen Sulfide | 24 h 0 m | 1st Stage High Pressure Separator on the Hydrocracker Unit | NO | NO | NO | BRQ |
Compressed Flammable Gas | 24 h 0 m | 1st Stage High Pressure Separator on the Hydrocracker Unit | NO | NO | YES | 1,388.0 pounds |
Accident Classified As:
; thermal stress from start up and shut down, along with cold rain that occurred on the day the leak was detected caused a flange to leak
CRLLC sends letter to rescind prior notification of H2S release.
Connect With Us: