Home Search Emissions Pollutants About the Database


Motiva Enterprises (1406), Norco

LDEQ Accident Report

Accident #122119
State Police #10-01305
Accident Date2010-03-13
Report Date 2010-03-18
Follow-up Date 0000-00-00
Follow-up: No

Pollutants Released

Pollutant Duration Point Source Greenhouse Gas Criteria Pollutant Ozone forming chemical Amount of Release
Benzene45h 15mHCU absorber surge drum PV-829NONOYESBRQ
Hydrogen Sulfide45h 15mHCU absorber surge drum PV-829NONONOBRQ
Propane45h 15mHCU oil absorber surge drum PV-829NONOYESBRQ

Accident Classified As:

Cause of Problem: Piping or Tubing

Operator on rounds discovered stain on nozzle bottle of vessel of hydrocracking unit. Plug missing, visible vapors, and there is a quarter inch hole leaking.

Discharge Preventable - No

"Unforeseen equipment failure."

Notes/Remedial Actions

BRQ. Refinery letter states that "final calculations confirm that no reportable quantities were exceeded." Steam lanced the leak initially, then got advice from piping inspectors for leak repair. Repaired with nipple and isolation valve with cap.