Accident # | 112663 |
State Police # | 090432 |
Accident Date | 2009-02-11 |
Report Date | 2009-02-19 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Sulfur Dioxide | 5h 55m | #3 flare | NO | YES | NO | 5,640.0 pounds |
Accident Classified As: Reportable Quantity
Plant power failure from storm event caused shut-down of processing units. Utility pole was knocked down which caused electrical sub-station to fail. Both Sulfur Recovery Units went down, the belco thermal oxidizers and most other processing units.
Due to storms
Attempting to repair electrical and restart units. LDEQ conducted a field inspection and completed a field interview form: Strong odor was noted upon arrival. Perimeter air monitoring was conducted. SO2 and H2S were the parameters that were monitored. All monitoring showed non-detect. Full PDF was not able to be uploaded at this time. Current PDF does not include LDEQ investigation form. No refinery letter.