Valero (26003), Norco

LDEQ Accident Report

Accident #100469
State Police #07-06454
Accident Date2007-10-24
Report Date 2007-10-31
Follow-up Date 0000-00-00
Follow-up: Yes

Pollutants Released

Pollutant Duration Point Source Greenhouse Gas Criteria Pollutant Ozone forming chemical Amount of Release
Sulfur DioxideNo information given.Thermal Oxidizer #2, Flares #1,2,3,4NOYESNOBRQ

Accident Classified As:

Cause of Problem: Instrument Failure

On Oct 24, 2007, Valero shut down the West Plant units. There was a communication issue with the Process Logic Controller (PLC) , resulting in the shutdown of the Crude Unit. The shutdown of the Crude Unit cascaded and caused the Vacuum, Coker, and Hydrotreater Units to shutdown as well. Consequently, problems began with the East Plant Units that resulted in flaring and an upset of their SRU 30.

Discharge Preventable -

Notes/Remedial Actions

Since the incident consisted of shutdown events that led to a flaring/incinerating event, the units were restarted as soon as the communication issue was resolved.