Home | Search | Emissions | Pollutants | About the Database |
Accident # | 81795 |
State Police # | 05-05912 |
Accident Date | 2005-08-27 |
Report Date | 2005-10-14 |
Follow-up Date | 0000-00-00 |
Follow-up: | No |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
Nitrogen Dioxide | 12h 15m | FCC Debutanizer Overhead Condenser | NO | YES | YES | BRQ |
Sulfur Dioxide | FCC Debutanizer Overhead Condenser | NO | YES | NO | BRQ | |
Hydrogen Sulfide | FCC Debutanizer Overhead Condenser | NO | NO | NO | BRQ | |
Volatile Organic Compounds (VOCs) | FCC Debutanizer Overhead Condenser | NO | NO | YES | BRQ | |
Nitric Oxide | FCC Debutanizer Overhead Condenser | NO | YES | NO | 74.0 |
Accident Classified As: Below Reportable Quantity (BRQ)
Condenser overpressured due to a failure with the FCC debutanizer overhead condenser, resulting in flaring and a small ground fire.
This release is not considered to be preventable at this time
For the FCC, the tower was returned to normal pressure and the pressure transmitter on the overhead condenser was repaired. The small ground fire was extinguished. This follow-up letter was delayed due to Hurricane Katrina This is a letter rescinding the 8/27/2005 notification for Sulfur Dioxide (S02), Hydrogen Sulfide (H2S), Nitrogen Dioxide (NO2), and Hydrocarbons (non-speciated VOCs). Upon further review, the total amounts were estimated to be less than reportable quantities. Nitric oxide was released to the atmosphere through the refinery Number 1 flare.
Connect With Us: